Single machine group scheduling with ordered criteria
From MaRDI portal
Publication:1897384
DOI10.1007/BF02099697zbMATH Open0838.90062OpenAlexW2061536561MaRDI QIDQ1897384FDOQ1897384
Authors: Adam Janiak, M. Y. Kovalyov
Publication date: 27 August 1995
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf02099697
Recommendations
- Single Machine Group Scheduling with Two Ordered Criteria
- Single-machine bicriterion group scheduling with deteriorating setup times and job processing times
- Bicriterion scheduling with group technology and deterioration effect
- Sequencing with ordered criteria, precedence and group technology constraints
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
total weighted completion timegroup technologymaximum costsingle machine group schedulingmulticriterion schedulingtotal weighted exponential time
Cites Work
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Title not available (Why is that?)
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Title not available (Why is that?)
Cited In (11)
- Single Machine Group Scheduling with Two Ordered Criteria
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing
- Group scheduling jobs on a single machine: A multi-objective approach with preemptive priority structure
- Single-machine ready times scheduling with group technology and proportional linear deterioration
- Bi-criteria sequencing of courses and formation of classes for a bottleneck classroom
- Single machine group scheduling with resource dependent setup and processing times
- Single machine group scheduling with time and position dependent processing times
- The G-group heuristic for single machine lot scheduling
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- Single machine group scheduling with position dependent processing times and ready times
- Group sequencing around a common due date
This page was built for publication: Single machine group scheduling with ordered criteria
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1897384)