Preemptive scheduling of independent jobs on parallel machines subject to financial constraints
From MaRDI portal
(Redirected from Publication:791440)
Recommendations
- Scheduling jobs to minimize total cost
- Parallel machine scheduling with a convex resource consumption function
- A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times
- Rational preemptive scheduling
- Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource
Cites work
- scientific article; zbMATH DE number 3644821 (Why is no real title available?)
- scientific article; zbMATH DE number 3688701 (Why is no real title available?)
- scientific article; zbMATH DE number 3722085 (Why is no real title available?)
- scientific article; zbMATH DE number 3599820 (Why is no real title available?)
- Cost-minimal preemptive scheduling of independent jobs with release and due dates on open shop under resource constraints
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Scheduling subject to nonrenewable-resource constraints
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
Cited in
(28)- Approximability of scheduling problems with resource consuming jobs
- A PTAS for a resource scheduling problem with arbitrary number of parallel machines
- Approximation schemes for single machine scheduling with non-renewable resource constraints
- Reductions between scheduling problems with non-renewable resources and knapsack problems
- A multivariate complexity analysis of the material consumption scheduling problem
- Single machine scheduling problems with financial resource constraints: some complexity results and properties
- Scheduling with non-renewable resources: minimizing the sum of completion times
- Polynomial algorithms for single machine scheduling problems with financial constraints
- Stochastic scheduling to minimize expected maximum lateness
- Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry
- Optimal resource profiles for program scheduling
- Algorithms – ESA 2005
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
- Preemptive scheduling with staircase and piecewise linear resource availability
- Preemptive repayment policy for multiple loans
- Scheduling jobs to minimize total cost
- Precedence constrained parallel-machine scheduling of position-dependent jobs
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource
- EPTAS for load balancing problem on parallel machines with a non-renewable resource
- EPTAS for load balancing problem on parallel machines with a non-renewable resource
- Lower bounds for the event scheduling problem with consumption and production of resources
- Scheduling unit-time tasks in renewable resource constrained flowshops
- Production scheduling problems in a textile industry
- Approximation schemes for parallel machine scheduling with non-renewable resources
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Minimizing makespan on a single machine with release dates and inventory constraints
- Mathematical Modeling of Scheduling Problems
This page was built for publication: Preemptive scheduling of independent jobs on parallel machines subject to financial constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q791440)