A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
From MaRDI portal
Publication:2275613
Recommendations
- Long- and short-term production scheduling at LKAB's Kiruna mine
- A review of long- and short-term production scheduling at LKAB's Kiruna Mine
- Short-term scheduling of production fleets in underground mines using CP-based LNS
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- Using aggregation to optimize long-term production planning at an underground mine
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Integrated optimization model of multi-period open-pit mine production scheduling
Cites work
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Conic mixed-integer rounding cuts
- Development of a heuristic project scheduler under resource constraints
- Exploring relaxation induced neighborhoods to improve MIP solutions
- Heuristic scheduling of resource-constrained projects with cash flows
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 5244953 (Why is no real title available?)
- scientific article; zbMATH DE number 5244954 (Why is no real title available?)
- Long- and short-term production scheduling at LKAB's Kiruna mine
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Network optimization for the design of underground mines
- Polyhedral results for the precedence-constrained knapsack problem
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Using aggregation to optimize long-term production planning at an underground mine
Cited in
(23)- Staff and machine shift scheduling in a German potash mine
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Optimizing the open pit-to-underground mining transition
- Linear models for stockpiling in open-pit mine production scheduling problems
- Iron ore production scheduling to improve product quality
- Uncertainty integration in dynamic mining reserves
- Short- and medium-term optimization of underground mine planning using constraint programming
- Strategic planning of an underground mine with variable cut-off grades
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- Short-term planning optimization model for underground mines
- Evolutionary approach for large-scale mine scheduling
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search
- Machine scheduling in underground mining: an application in the potash industry
- Optimizing long-term production plans in underground and open-pit copper mines
- A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
- Optimization-based heuristics for underground mine scheduling
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- Integrated optimization model of multi-period open-pit mine production scheduling
- Long- and short-term production scheduling at LKAB's Kiruna mine
- A review of long- and short-term production scheduling at LKAB's Kiruna Mine
- Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
- A sliding time window heuristic for open pit mine block sequencing
- Using aggregation to optimize long-term production planning at an underground mine
This page was built for publication: A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2275613)