Integrated optimization model of multi-period open-pit mine production scheduling
From MaRDI portal
Recommendations
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- An application of branch and cut to open pit mine scheduling
- Optimizing long-term production plans in underground and open-pit copper mines
- A new algorithm for the open-pit mine production scheduling problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
Cited in
(5)- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- Concurrent open-pit mine production and in-pit crushing–conveying system planning
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
This page was built for publication: Integrated optimization model of multi-period open-pit mine production scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5277195)