Concurrent open-pit mine production and in-pit crushing–conveying system planning
From MaRDI portal
Publication:5059445
DOI10.1080/0305215X.2019.1678150OpenAlexW2989440164MaRDI QIDQ5059445
Morteza Paricheh, Morteza Osanloo
Publication date: 23 December 2022
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2019.1678150
open-pit mininghaul fleet sizingin-pit crushing and conveying system planningmine production planning
Cites Work
- Long term production planning of open pit mines by ant colony optimization
- Aggregation heuristic for the open-pit block scheduling problem
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- A sliding time window heuristic for open pit mine block sequencing
- An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- An application of branch and cut to open pit mine scheduling
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- Large-scale multi-period precedence constrained knapsack problem: A mining application
- A New Algorithm for the Open-Pit Mine Production Scheduling Problem
This page was built for publication: Concurrent open-pit mine production and in-pit crushing–conveying system planning