Strategic planning of an underground mine with variable cut-off grades
From MaRDI portal
Publication:2218873
DOI10.1007/s11081-019-09479-6zbMath1457.90097OpenAlexW3007741543MaRDI QIDQ2218873
Rafael Martinelli, Michel Gamache, Jean-François Collard
Publication date: 18 January 2021
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-019-09479-6
optimizationschedulingunderground mininglong-term planningmixed integer programming modelcut-off grade
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- An application of branch and cut to open pit mine scheduling
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Solving large multiple-depot multiple-vehicle-type bus scheduling problems in practice
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- Production Planning by Mixed Integer Programming
- Variable neighborhood search: Principles and applications
- Unnamed Item
This page was built for publication: Strategic planning of an underground mine with variable cut-off grades