Short- and medium-term optimization of underground mine planning using constraint programming
From MaRDI portal
Publication:2112619
DOI10.1007/s10601-022-09337-wOpenAlexW4297312265MaRDI QIDQ2112619
Louis-Pierre Campeau, Michel Gamache
Publication date: 11 January 2023
Published in: Constraints (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10601-022-09337-w
Nonconvex programming, global optimization (90C26) Deterministic scheduling theory in operations research (90B35)
Uses Software
Cites Work
- Optimization-based heuristics for underground mine scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG
- Fleet scheduling in underground mines using constraint programming
- Using constraint programming for solving RCPSP/MAX-cal
- On the strength of time-indexed formulations for the resource-constrained project scheduling problem
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Strategic planning of an underground mine with variable cut-off grades
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Short-term planning optimization model for underground mines
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- Solving LP Relaxations of Large-Scale Precedence Constrained Problems