Optimization-based heuristics for underground mine scheduling
DOI10.1016/J.EJOR.2014.08.020zbMATH Open1338.90178OpenAlexW2096140780MaRDI QIDQ299816FDOQ299816
Authors: Dónal O'Sullivan, Alexandra M. Newman
Publication date: 23 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.08.020
Recommendations
- A new algorithm for the open-pit mine production scheduling problem
- Underground mine scheduling under uncertainty
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- Using aggregation to optimize long-term production planning at an underground mine
integer programming applications: determining a production schedulemining/metals industries: determining optimal operating policies at an underground mineproduction/scheduling applications: production scheduling at an underground mine
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90) Integer programming (90C10) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Production Planning by Mixed Integer Programming
- Title not available (Why is that?)
- An application of branch and cut to open pit mine scheduling
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing long-term production plans in underground and open-pit copper mines
- Using aggregation to optimize long-term production planning at an underground mine
- A mathematical programming viewpoint for solving the ultimate pit problem
- On practical resource allocation for production planning and scheduling with period overlapping setups
- Medium range optimization of copper extraction planning under uncertainty in future copper prices
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
- Cyclic Scheduling via Integer Programs with Circular Ones
- A sliding time window heuristic for open pit mine block sequencing
- On a fix-and-relax framework for a class of project scheduling problems
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
Cited In (16)
- Linear models for stockpiling in open-pit mine production scheduling problems
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- Machine scheduling in underground mining: an application in the potash industry
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- Optimizing the open pit-to-underground mining transition
- Using aggregation to optimize long-term production planning at an underground mine
- Underground mine scheduling under uncertainty
- A sliding time window heuristic for open pit mine block sequencing
- A shortest-path algorithm for solving the fleet management problem in underground mines
- Short- and medium-term optimization of underground mine planning using constraint programming
- Efficient algorithms of pathwise dynamic programming for decision optimization in mining operations
- Short-term planning optimization model for underground mines
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search
- An efficient decision making process for vehicles operations in underground mining
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
- Pattern search method for accelerating Stope boundary optimization problem in underground mining operations