Using aggregation to optimize long-term production planning at an underground mine
From MaRDI portal
Recommendations
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing long-term production plans in underground and open-pit copper mines
- Optimization-based heuristics for underground mine scheduling
- Long- and short-term production scheduling at LKAB's Kiruna mine
- Aggregation heuristic for the open-pit block scheduling problem
Cites work
- scientific article; zbMATH DE number 1349588 (Why is no real title available?)
- A New Knapsack Solution Approach by Integer Equivalent Aggregation and Consistency Determination
- A Stochastic Convergence Model for Portfolio Selection
- A procedure for optimizing tactical response in oil spill clean up operations
- Aggregating diophantine equations
- Aggregation and Disaggregation Techniques and Methodology in Optimization
- Aggregation and Mixed Integer Rounding to Solve MIPs
- Modelling practical lot-sizing problems as mixed-integer programs
- Polynomial-Time Aggregation of Integer Programming Problems
- The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach
Cited in
(25)- A review of long- and short-term production scheduling at LKAB's Kiruna Mine
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
- Uncertainty integration in dynamic mining reserves
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing a mineral value chain with market uncertainty using Benders decomposition
- Long- and short-term production scheduling at LKAB's Kiruna mine
- Machine scheduling in underground mining: an application in the potash industry
- Scalable timing-aware network design via Lagrangian decomposition
- Runtime reduction techniques for the probabilistic traveling salesman problem with deadlines
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
- Underground mine scheduling under uncertainty
- Optimization-based heuristics for underground mine scheduling
- Strategic planning of an underground mine with variable cut-off grades
- Optimizing transient gas network control for challenging real-world instances using MIP-based heuristics
- Optimizing long-term production plans in underground and open-pit copper mines
- Challenges and Advances in A Priori Routing
- Solving network design problems via iterative aggregation
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Optimization for L1-Norm Error Fitting via Data Aggregation
- Maximizing the net present value of a Steiner tree
- An efficient decision making process for vehicles operations in underground mining
- Longwall mining automation an application of minimum-variance smoothing [Applications of Control]
- Optimizing the open pit-to-underground mining transition
- Short-term planning optimization model for underground mines
This page was built for publication: Using aggregation to optimize long-term production planning at an underground mine