A review of the contribution of operational research to project management
From MaRDI portal
Publication:5955087
DOI10.1016/S0377-2217(01)00097-2zbMath1086.90532MaRDI QIDQ5955087
No author found.
Publication date: 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Related Items
Models and algorithms for network reduction, Multiobjective project portfolio selection with fuzzy constraints, A genetic algorithm for resource investment problem with discounted cash flows, A review of the recent contribution of systems thinking to operational research and management science, Designing practical coordinating contracts in decentralized projects, An IT projects’ conceptual model to facilitate upstream decision‐making: project management method selection, Optimizing multi-team system behaviors: insights from modeling team communication, Adjustment of the moments of the project completion times when activity times are exponentially distributed, An updated survey of variants and extensions of the resource-constrained project scheduling problem, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Evaluating project completion times when activity times are Weibull distributed, A survey of variants and extensions of the resource-constrained project scheduling problem, A zero-one goal programming approach for project selection, A fuzzy approach for selecting project membership to achieve cognitive style goals, Unnamed Item, The most likely path on series-parallel networks, Stochastic activity networks with truncated exponential activity times
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Project management and scheduling: a permanent challenge for OR
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Project bidding under deterministic and probabilistic activity durations
- The scheduling of activities to maximize the net present value of projects
- A multi-stage non-deterministic model for project scheduling under resources constraints
- DAGEN: A generator of testsets for project activity nets
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- Heuristics for multimode scheduling problems with dedicated resources
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- On the optimal management of project risk
- A stochastic model to control project duration and expenditure
- Activity nets: A guided tour through some recent developments
- The risk of delay of a project in terms of the morphology of its network
- Optimal resource profiles for program scheduling
- Resource allocation via dynamic programming in activity networks
- A revised critical path method for networks including both overlap relationships and variable-duration activities
- Hierarchical models for multi-project planning and scheduling
- Critical-Path Planning and Scheduling: Mathematical Basis
- Bounding the Project Completion Time Distribution in PERT Networks
- A Multivariate Approach to Estimating the Completion Time for PERT Networks
- Incremental modular decomposition
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Technical Note—Expected Completion Time in Pert Networks
- A Random Activity Network Generator
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- Expected Critical Path Lengths in PERT Networks
- On the Expected Duration of PERT Type Networks