Scenario-based approach for flexible resource loading under uncertainty
From MaRDI portal
Recommendations
- Production planning with order acceptance and demand uncertainty
- Workload based order acceptance in job shop environments
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Resource loading with time windows
- Job-shop resource scheduling via simulating random operations
Cites work
- Branch-and-price: Column generation for solving huge integer programs
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Solving binary cutting stock problems by column generation and branch- and-bound
- The construction of stable project baseline schedules
- Towards intelligent manufacturing planning and control systems
Cited in
(8)- Production planning with order acceptance and demand uncertainty
- A genetic algorithm for the robust resource leveling problem
- Resource loading with time windows
- Collaborative production planning of supply chain under price and demand uncertainty
- Polyhedral results and branch-and-cut for the resource loading problem
- Optimization with uncertainties: a scheduling example
- A new time-driven mixed-integer programming model for rough-cut capacity planning
- Heuristics for workforce planning with worker differences
This page was built for publication: Scenario-based approach for flexible resource loading under uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4671361)