| Publication | Date of Publication | Type |
|---|
Maximizing the net present value of a project under uncertainty: activity delays and dynamic policies European Journal of Operational Research | 2024-07-16 | Paper |
An improved decomposition-based heuristic for truck platooning Computers \& Operations Research | 2023-11-15 | Paper |
Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms INFORMS Journal on Computing | 2023-01-11 | Paper |
A pessimist's approach to one-sided matching European Journal of Operational Research | 2022-12-12 | Paper |
Recovery from demand disruption: two-stage financing strategy for a capital-constrained supply chain under uncertainty European Journal of Operational Research | 2022-07-22 | Paper |
The TSP with drones: The benefits of retraversing the arcs | 2022-07-07 | Paper |
Exact and Approximation Algorithms for the Expanding Search Problem INFORMS Journal on Computing | 2022-06-28 | Paper |
Time-critical testing and search problems European Journal of Operational Research | 2021-11-09 | Paper |
Polyhedral results and branch-and-cut for the resource loading problem INFORMS Journal on Computing | 2021-06-23 | Paper |
Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families | 2021-02-03 | Paper |
Exact algorithms for budgeted prize-collecting covering subgraph problems | 2021-01-10 | Paper |
A branch-and-price algorithm for parallel machine scheduling using ZDDs and generic branching INFORMS Journal on Computing | 2020-12-03 | Paper |
A two-stage robust model for a reliable \(p\)-center facility location problem Applied Mathematical Modelling | 2020-04-24 | Paper |
New results on the coordination of transportation and batching scheduling Applied Mathematical Modelling | 2020-01-29 | Paper |
Timely exposure of a secret project: which activities to monitor? Naval Research Logistics | 2019-09-17 | Paper |
Scheduling Markovian PERT networks to maximize the net present value: new results Operations Research Letters | 2019-06-11 | Paper |
Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods European Journal of Operational Research | 2019-01-09 | Paper |
New strategies for stochastic resource-constrained project scheduling Journal of Scheduling | 2018-11-07 | Paper |
Precedence theorems and dynamic programming for the single-machine weighted tardiness problem European Journal of Operational Research | 2018-10-30 | Paper |
Minimum-cost diagnostic strategies for \(k\)-out-of-\(n\) systems with imperfect tests Discrete Applied Mathematics | 2018-09-25 | Paper |
An exact algorithm for parallel machine scheduling with conflicts Journal of Scheduling | 2017-08-25 | Paper |
Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project European Journal of Operational Research | 2016-10-07 | Paper |
Resource loading with time windows European Journal of Operational Research | 2016-10-06 | Paper |
Practical solutions for a dock assignment problem with trailer transportation European Journal of Operational Research | 2016-10-06 | Paper |
Exact algorithms for single-machine scheduling with time windows and precedence constraints Journal of Scheduling | 2016-09-08 | Paper |
Project planning with alternative technologies in uncertain environments European Journal of Operational Research | 2016-07-25 | Paper |
Coloring graphs using two colors while avoiding monochromatic cycles INFORMS Journal on Computing | 2016-06-29 | Paper |
A combination of flow shop scheduling and the shortest path problem Journal of Combinatorial Optimization | 2015-07-10 | Paper |
Self-imposed time windows in vehicle routing problems OR Spectrum | 2015-04-10 | Paper |
Optimal solutions for a dock assignment problem with trailer transportation Annals of Operations Research | 2014-09-26 | Paper |
Scheduling modular projects on a bottleneck resource Journal of Scheduling | 2014-08-18 | Paper |
Complexity results and exact algorithms for robust knapsack problems Journal of Optimization Theory and Applications | 2014-06-30 | Paper |
Robust maximum weighted independent-set problems on interval graphs Optimization Letters | 2014-03-14 | Paper |
Resource allocation by means of project networks: dominance results Networks | 2012-01-18 | Paper |
Optimization models for targeted offers in direct marketing: exact and heuristic algorithms European Journal of Operational Research | 2011-06-07 | Paper |
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing Journal of Scheduling | 2011-05-30 | Paper |
Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment Computers \& Operations Research | 2010-10-15 | Paper |
Exact Algorithms for Coloring Graphs While Avoiding Monochromatic Cycles Algorithmic Aspects in Information and Management | 2010-07-20 | Paper |
Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning Journal of Heuristics | 2010-04-21 | Paper |
Scheduling Markovian PERT networks to maximize the net present value Operations Research Letters | 2010-03-18 | Paper |
Scheduling for stability in single-machine production systems Journal of Scheduling | 2009-08-28 | Paper |
Efficient solutions for mastermind using genetic algorithms Computers \& Operations Research | 2009-02-12 | Paper |
Dynamic order acceptance and capacity planning on a single bottleneck resource Naval Research Logistics | 2008-05-29 | Paper |
Meta-heuristics for stable scheduling on a single machine Computers \& Operations Research | 2008-01-23 | Paper |
Proactive-reactive project scheduling trade-offs and procedures | 2007-03-09 | Paper |
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling European Journal of Operational Research | 2005-10-26 | Paper |
The complexity of machine scheduling for stability with a single disrupted job Operations Research Letters | 2005-08-25 | Paper |
Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment The Journal of the Operational Research Society | 2005-04-26 | Paper |
Project scheduling under uncertainty: survey and research potentials European Journal of Operational Research | 2005-04-21 | Paper |
The generation of stable project plans 4OR | 2005-02-11 | Paper |
The construction of stable project baseline schedules European Journal of Operational Research | 2004-08-19 | Paper |
On the connected (sub)partition polytope | N/A | Paper |