Project scheduling: The effects of problem structure on heuristic performance
From MaRDI portal
Publication:4090103
DOI10.1002/NAV.3800230110zbMATH Open0325.90027OpenAlexW1965722553MaRDI QIDQ4090103FDOQ4090103
Authors: James H. Patterson
Publication date: 1976
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800230110
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Cited In (32)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- A random generator of resource-constrained multi-project network problems
- Reducing the feasible solution space of resource-constrained project instances
- On the summary measures for the resource-constrained project scheduling problem
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Resource-constrained project scheduling with activity splitting and setup times
- A framework for an interactive project scheduling system under limited resources
- On the measurement of complexity in activity networks
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- Heuristic methods and applications: A categorized survey
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- A classification of predictive-reactive project scheduling procedures
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Knowledge integration using problem spaces: A study in resource-constrained project scheduling
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- On the use of the complexity index as a measure of complexity in activity networks
- Going to the core of hard resource-constrained project scheduling instances
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances
- Capital- and resource-constrained project scheduling with net present value optimization
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- A heuristic procedure for solving the dynamic probabilistic project expediting problem
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- Hierarchical models for multi-project planning and scheduling
- A constraint-based perspective in resource constrained project scheduling
This page was built for publication: Project scheduling: The effects of problem structure on heuristic performance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4090103)