Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
From MaRDI portal
Publication:5945225
DOI10.1007/PL00013356zbMath0989.90060OpenAlexW1966505186MaRDI QIDQ5945225
Christoph Schwindt, Birger Franck, Klaus Neumann
Publication date: 7 August 2002
Published in: OR Spektrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/pl00013356
tabu searchgenetic algorithmspriority-rule methodsresource-constrained project schedulingtruncated branch-and-bound
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (19)
Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars ⋮ A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮ Modelling and solving generalised operational surgery scheduling problems ⋮ On the integration of diverging material flows into resource-constrained project scheduling ⋮ A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮ Order-based neighborhoods for project scheduling with nonregular objective functions. ⋮ A cyclic scheduling problem with an undetermined number of parallel identical processors ⋮ A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints ⋮ Using constraint programming for solving RCPSP/MAX-cal ⋮ Exact methods for the resource levelling problem ⋮ A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project ⋮ Solving RCPSP/max by lazy clause generation ⋮ An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags ⋮ Considering project management activities for engineering design groups ⋮ Meta-heuristics for stable scheduling on a single machine ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ An optimal algorithm for global optimization and adaptive covering ⋮ Project selection, scheduling and resource allocation with time dependent returns ⋮ A priority-rule method for project scheduling with work-content constraints