Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling

From MaRDI portal
Publication:5945225

DOI10.1007/PL00013356zbMath0989.90060OpenAlexW1966505186MaRDI QIDQ5945225

Christoph Schwindt, Birger Franck, Klaus Neumann

Publication date: 7 August 2002

Published in: OR Spektrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/pl00013356




Related Items (19)

Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsA partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsModelling and solving generalised operational surgery scheduling problemsOn the integration of diverging material flows into resource-constrained project schedulingA constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsOrder-based neighborhoods for project scheduling with nonregular objective functions.A cyclic scheduling problem with an undetermined number of parallel identical processorsA branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraintsUsing constraint programming for solving RCPSP/MAX-calExact methods for the resource levelling problemA fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectSolving RCPSP/max by lazy clause generationAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsConsidering project management activities for engineering design groupsMeta-heuristics for stable scheduling on a single machineTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesAn optimal algorithm for global optimization and adaptive coveringProject selection, scheduling and resource allocation with time dependent returnsA priority-rule method for project scheduling with work-content constraints




This page was built for publication: Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling