A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
From MaRDI portal
Publication:4363602
DOI10.1287/MNSC.42.10.1395zbMATH Open0880.90074OpenAlexW2027772250MaRDI QIDQ4363602FDOQ4363602
Publication date: 12 November 1997
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.42.10.1395
Recommendations
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.
- On maximizing the net present value of a project under renewable resource constraints
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- scientific article; zbMATH DE number 1264426
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
Cited In (30)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
- Considering project management activities for engineering design groups
- Title not available (Why is that?)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for resource investment problem with discounted cash flows
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
- On scheduling credited projects
- Resource-constrained project scheduling: A survey of recent developments.
- Progress payments in project scheduling problems.
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The project scheduling problem with irregular starting time costs
- Financing and reliability analysis for schedules in the project calendar planning problem
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties
- Project network models with discounted cash flows a guided tour through recent developments
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- PSPLIB -- a project scheduling problem library
- Project selection, scheduling and resource allocation with time dependent returns
- An investigation of buffer sizing techniques in critical chain scheduling
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Solving the resource constrained project scheduling problem with optimization subroutine library
This page was built for publication: A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4363602)