Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
From MaRDI portal
Recommendations
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Multidirectional scheduling scheme in resource‐constrained project schedulingproblem
- scientific article; zbMATH DE number 1808554
- Development of a heuristic project scheduler under resource constraints
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
Cites work
- A branch and bound algorithm for the resource-constrained project scheduling problem
- A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
- Adaptive search for solving hard project scheduling problems
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
- An investigation into the relationship of heuristic performance with network-resource characteristics
- An iterative scheduling technique for resource-constrained project scheduling
- Applying tabu search to the job-shop scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
- Heuristics for resource-constrained scheduling†
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling
- Scheduling of Project Networks by Job Assignment
- Scheduling of resource-constrained projects
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
Cited in
(14)- Activity list representation for a generalization of the resource-constrained project scheduling problem
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources
- Towards merging binary integer programming techniques with genetic algorithms
- A tree search heuristic for the resource constrained project scheduling problem with transfer times
- Considering project management activities for engineering design groups
- Deadline division-based heuristic for cost optimization in workflow scheduling
- Project selection, scheduling and resource allocation with time dependent returns
- New representation to reduce the search space for the resource-constrained project scheduling problem
- A particle swarm optimization-based algorithm for job-shop scheduling problems
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
- Tri-directional scheduling scheme: theory and computation
- A three-dimensional spatial resource-constrained project scheduling problem: model and heuristic
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
This page was built for publication: Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1841162)