SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY
From MaRDI portal
Publication:5708849
DOI10.1142/S0217595905000674zbMath1088.90020OpenAlexW2057482651MaRDI QIDQ5708849
Les R. Foulds, James L. Corner
Publication date: 21 November 2005
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595905000674
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items (1)
Cites Work
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Optimal resource leveling using non-serial dynamic programming
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Resource levelling for projects with schedule-dependent time windows
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Unnamed Item
This page was built for publication: SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY