Jürgen Zimmermann

From MaRDI portal
Person:207570

Available identifiers

zbMath Open zimmermann.jurgenMaRDI QIDQ207570

List of research outcomes





PublicationDate of PublicationType
Multi-start heuristics for unit-capacity orienteering problems2024-09-17Paper
Resource overload problems with tardiness penalty: structural properties and solution approaches2024-08-15Paper
Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints2024-08-15Paper
A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints2023-06-23Paper
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints2022-07-06Paper
Solution procedures for block selection and sequencing in flat-bedded potash underground mines2021-11-09Paper
A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers2021-06-07Paper
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints2020-08-28Paper
A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems2020-05-11Paper
Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages2019-03-06Paper
Minimizing average project team size given multi-skilled workers with heterogeneous skill levels2018-07-12Paper
Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems2018-05-30Paper
Staff and machine shift scheduling in a German potash mine2018-02-28Paper
Two-Stage Heuristic Approach for Solving the Long-Term Unit Commitment Problem with Hydro-Thermal Coordination2017-12-01Paper
Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars2016-10-07Paper
Machine scheduling in underground mining: an application in the potash industry2016-05-04Paper
On a multi-project staffing problem with heterogeneously skilled workers2015-03-03Paper
MILP-Formulations for the Total Adjustment Cost Problem2015-02-12Paper
Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery2015-02-03Paper
The total adjustment cost problem: applications, models, and solution algorithms2014-08-18Paper
Exact methods for the resource levelling problem2014-02-05Paper
Mixed-integer linear programming for resource leveling problems2012-12-29Paper
A heuristic approach to project staffing2012-05-13Paper
Dismantling of nuclear power plants at optimal NPV2011-11-17Paper
A new mixed integer linear model for a rich vehicle routing problem with docking constraints2011-04-08Paper
A Branch-and-Cut Approach to the Vehicle Routing Problem with Simultaneous Delivery and Pick-up2011-04-07Paper
Optimal Usage of Flexibility Instruments in Automotive Plants2011-04-07Paper
Production Chain Planning in the Automotive Industry2011-04-07Paper
A Sampling Procedure for Real-Life Rich Vehicle Routing Problems2011-04-07Paper
Scheduling tests in automotive R\&D projects2008-11-18Paper
Resource leveling in make-to-order production: modeling and heuristic solution method2008-08-12Paper
https://portal.mardi4nfdi.de/entity/Q34264422007-03-09Paper
https://portal.mardi4nfdi.de/entity/Q34165962007-01-22Paper
https://portal.mardi4nfdi.de/entity/Q46670902005-04-19Paper
A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources2004-03-15Paper
https://portal.mardi4nfdi.de/entity/Q44370362003-12-07Paper
Order-based neighborhoods for project scheduling with nonregular objective functions.2003-07-30Paper
A steepest ascent approach to maximizing the net present value of projects2003-07-15Paper
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications2003-04-10Paper
Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.2002-01-01Paper
Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions2001-10-11Paper
Conception and realization of an active database system: Architecture, interfaces and tools2001-09-19Paper
https://portal.mardi4nfdi.de/entity/Q27123742001-05-06Paper
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints2000-12-19Paper
Time complexity of single- and identical parallel-machine scheduling with GERT network precedence constraints2000-05-07Paper
Resource levelling for projects with schedule-dependent time windows1999-11-08Paper
https://portal.mardi4nfdi.de/entity/Q42515441999-10-06Paper
Heuristic procedures for parallel-machine scheduling problems with stochastic precedence constraints1999-05-17Paper

Research outcomes over time

This page was built for person: Jürgen Zimmermann