| Publication | Date of Publication | Type |
|---|
| Multi-start heuristics for unit-capacity orienteering problems | 2024-09-17 | Paper |
Resource overload problems with tardiness penalty: structural properties and solution approaches Annals of Operations Research | 2024-08-15 | Paper |
Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints Annals of Operations Research | 2024-08-15 | Paper |
A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints Journal of Scheduling | 2023-06-23 | Paper |
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints OR Spectrum | 2022-07-06 | Paper |
Solution procedures for block selection and sequencing in flat-bedded potash underground mines OR Spectrum | 2021-11-09 | Paper |
A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers European Journal of Operational Research | 2021-06-07 | Paper |
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints OR Spectrum | 2020-08-28 | Paper |
A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems OR Spectrum | 2020-05-11 | Paper |
Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages Annals of Operations Research | 2019-03-06 | Paper |
Minimizing average project team size given multi-skilled workers with heterogeneous skill levels Computers & Operations Research | 2018-07-12 | Paper |
Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems European Journal of Operational Research | 2018-05-30 | Paper |
Staff and machine shift scheduling in a German potash mine Journal of Scheduling | 2018-02-28 | Paper |
Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination Operations Research Proceedings | 2017-12-01 | Paper |
Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars European Journal of Operational Research | 2016-10-07 | Paper |
Machine scheduling in underground mining: an application in the potash industry OR Spectrum | 2016-05-04 | Paper |
On a multi-project staffing problem with heterogeneously skilled workers Operations Research Proceedings | 2015-03-03 | Paper |
MILP-Formulations for the Total Adjustment Cost Problem Operations Research Proceedings | 2015-02-12 | Paper |
Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery European Journal of Operational Research | 2015-02-03 | Paper |
The total adjustment cost problem: applications, models, and solution algorithms Journal of Scheduling | 2014-08-18 | Paper |
Exact methods for the resource levelling problem Journal of Scheduling | 2014-02-05 | Paper |
Mixed-integer linear programming for resource leveling problems European Journal of Operational Research | 2012-12-29 | Paper |
A heuristic approach to project staffing Electronic Notes in Discrete Mathematics | 2012-05-13 | Paper |
Dismantling of nuclear power plants at optimal NPV Annals of Operations Research | 2011-11-17 | Paper |
A new mixed integer linear model for a rich vehicle routing problem with docking constraints Annals of Operations Research | 2011-04-08 | Paper |
A branch-and-cut approach to the vehicle routing problem with simultaneous delivery and pick-up Operations Research Proceedings 2008 | 2011-04-07 | Paper |
Optimal usage of flexibility instruments in automotive plants Operations Research Proceedings 2006 | 2011-04-07 | Paper |
Production chain planning in the automotive industry Operations Research Proceedings 2008 | 2011-04-07 | Paper |
A sampling procedure for real-life rich vehicle routing problems Operations Research Proceedings | 2011-04-07 | Paper |
Scheduling tests in automotive R\&D projects European Journal of Operational Research | 2008-11-18 | Paper |
| Resource leveling in make-to-order production: modeling and heuristic solution method | 2008-08-12 | Paper |
| Resource-constrained project scheduling with time windows | 2007-03-09 | Paper |
| Scheduling tests in automotive R\&D projects | 2007-01-22 | Paper |
| scientific article; zbMATH DE number 2159155 (Why is no real title available?) | 2005-04-19 | Paper |
A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources Naval Research Logistics | 2004-03-15 | Paper |
| scientific article; zbMATH DE number 2013754 (Why is no real title available?) | 2003-12-07 | Paper |
Order-based neighborhoods for project scheduling with nonregular objective functions. European Journal of Operational Research | 2003-07-30 | Paper |
A steepest ascent approach to maximizing the net present value of projects Mathematical Methods of Operations Research | 2003-07-15 | Paper |
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications CEJOR. Central European Journal of Operations Research | 2003-04-10 | Paper |
Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. CEJOR. Central European Journal of Operations Research | 2002-01-01 | Paper |
Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions Lecture Notes in Economics and Mathematical Systems | 2001-10-11 | Paper |
| Conception and realization of an active database system: Architecture, interfaces and tools | 2001-09-19 | Paper |
| scientific article; zbMATH DE number 1594565 (Why is no real title available?) | 2001-05-06 | Paper |
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints European Journal of Operational Research | 2000-12-19 | Paper |
Time complexity of single- and identical parallel-machine scheduling with GERT network precedence constraints Mathematical Methods of Operations Research | 2000-05-07 | Paper |
Resource levelling for projects with schedule-dependent time windows European Journal of Operational Research | 1999-11-08 | Paper |
| scientific article; zbMATH DE number 1304715 (Why is no real title available?) | 1999-10-06 | Paper |
Heuristic procedures for parallel-machine scheduling problems with stochastic precedence constraints Annals of Operations Research | 1999-05-17 | Paper |