Time-constrained project scheduling with adjacent resources
From MaRDI portal
Publication:709144
DOI10.1016/J.COR.2010.05.006zbMATH Open1231.90198OpenAlexW2131027508MaRDI QIDQ709144FDOQ709144
Authors: A. L. Kok, J. M. J. Schutten, Johann L. Hurink, Jacob Jan Paulus
Publication date: 15 October 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://research.utwente.nl/en/publications/timeconstrained-project-scheduling-with-adjacent-resources(131c011b-9302-4d05-b807-e22432e7571f).html
Recommendations
Cites Work
- PSPLIB -- a project scheduling problem library
- Project scheduling with inventory constraints
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Time-constrained project scheduling
- The berth planning problem
- Packing problems and project scheduling models: an integrating perspective
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis
- On the complexity of adjacent resource scheduling
- Heuristics for scheduling with inventory: Dynamic focus via constraint criticality
- Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
- Higher‐Dimensional Packing with Order Constraints
Cited In (6)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems
- Resource-constrained project scheduling with activity splitting and setup times
- Exact and approximate methods for parallel multiple-area spatial scheduling with release times
- A metaheuristic solution approach for the time-constrained project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
Uses Software
This page was built for publication: Time-constrained project scheduling with adjacent resources
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q709144)