Energetic reasoning for energy-constrained scheduling with a continuous resource
From MaRDI portal
Publication:2356117
DOI10.1007/s10951-014-0404-yzbMath1320.90022OpenAlexW2013843202MaRDI QIDQ2356117
Pierre Lopez, Christian Artigues
Publication date: 28 July 2015
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-014-0404-y
complexityenergetic reasoning satisfiability testenergy requirementscheduling with continuous resources
Related Items (7)
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions ⋮ Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions ⋮ An \(O(n^2)\) algorithm for time-bound adjustments for the cumulative scheduling problem ⋮ A hybrid exact method for a scheduling problem with a continuous resource and energy constraints ⋮ Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions ⋮ Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem ⋮ Packing-based branch-and-bound for discrete malleable task scheduling
Cites Work
- Unnamed Item
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Robust energy planning in buildings with energy and comfort costs
- Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan
- Explaining the \texttt{cumulative} propagator
- A priority-rule method for project scheduling with work-content constraints
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Strong polynomiality of resource constraint propagation
- A Boolean satisfiability approach to the resource-constrained project scheduling problem
- Solving RCPSP/max by lazy clause generation
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- An Approximative Criterion for the Potential of Energetic Reasoning
- A Continuous Multi-resources cumulative Constraint with Positive-Negative Resource Consumption-Production
- A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems
- Max Energy Filtering Algorithm for Discrete Cumulative Resources
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
This page was built for publication: Energetic reasoning for energy-constrained scheduling with a continuous resource