Pierre Lopez

From MaRDI portal
Person:280175

Available identifiers

zbMath Open lopez.pierreMaRDI QIDQ280175

List of research outcomes

PublicationDate of PublicationType
Constraint programming for the robust two-machine flow-shop scheduling problem with budgeted uncertainty2023-10-04Paper
Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem2023-07-04Paper
Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem2019-03-22Paper
Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions2018-02-22Paper
A note on ``Event-based MILP models for resource-constrained project scheduling problems2016-11-14Paper
A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite2016-10-06Paper
Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions2016-05-18Paper
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions2016-05-04Paper
A hybrid exact method for a scheduling problem with a continuous resource and energy constraints2015-11-09Paper
Energetic reasoning for energy-constrained scheduling with a continuous resource2015-07-28Paper
Scheduling scientific experiments for comet exploration2015-04-29Paper
https://portal.mardi4nfdi.de/entity/Q28614942013-11-08Paper
Weight-based heuristics for constraint satisfaction and combinatorial optimization problems2013-05-29Paper
A branch-and-price algorithm for the windy rural postman problem2012-04-18Paper
Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks2011-05-26Paper
Event-based MILP models for resource-constrained project scheduling problems2010-10-15Paper
Parallel machine scheduling with precedence constraints and setup times2010-09-07Paper
Discrepancy search for the flexible job shop scheduling problem2010-09-07Paper
YIELDS: A Yet Improved Limited Discrepancy Search for CSPs2009-03-10Paper
Elementary theory and practice of sliding mode control strategies2006-05-31Paper
Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis2006-03-07Paper
On not-first/not-last conditions in disjunctive scheduling2000-12-19Paper
Cooperative system design in scheduling1999-06-08Paper
Robust stabilization and tracking for robotic manipulators with artificial muscles1997-11-09Paper
https://portal.mardi4nfdi.de/entity/Q43471681997-08-07Paper
An application of sliding mode control to the determination of system orders1995-01-01Paper
https://portal.mardi4nfdi.de/entity/Q52892671993-08-22Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Pierre Lopez