PublicationDate of PublicationType
Two-stage stochastic/robust scheduling based on permutable operation groups2024-09-03Paper
Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective2024-08-15Paper
A comparison of alternative models for solving a non-linear single plant hydro unit commitment problem2024-06-25Paper
Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration2023-11-14Paper
Robust Predictive-Reactive Scheduling: An Information-Based Decision Tree Model2022-12-06Paper
Properties, extensions and application of piecewise linearization for Euclidean norm optimization in \(\mathbb{R}^2\)2022-11-07Paper
A project scheduling problem with periodically aggregated resource-constraints2022-03-09Paper
Solving the time-discrete winter runway scheduling problem: a column generation and constraint programming approach2022-02-23Paper
Linearization of Euclidean norm dependent inequalities applied to multibeam satellites design2019-06-13Paper
Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem2019-03-22Paper
On the strength of time-indexed formulations for the resource-constrained project scheduling problem2019-02-22Paper
Integrated production and outbound distribution scheduling problems with job release dates and deadlines2018-11-07Paper
Column generation algorithms for bi-objective combinatorial optimization problems with a min-max objective2018-11-07Paper
Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence2018-02-28Paper
Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions2018-02-22Paper
A Comparison of a Global Approach and a Decomposition Method for Frequency Assignment in Multibeam Satellite Systems2017-07-26Paper
Integrated Production Scheduling and Delivery Routing: Complexity Results and Column Generation2016-11-30Paper
A note on ``Event-based MILP models for resource-constrained project scheduling problems2016-11-14Paper
Machine reassignment problem: the ROADEF/EURO challenge 20122016-11-07Paper
Line search method for solving a non-preemptive strictly periodic scheduling problem2016-09-08Paper
Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions2016-05-18Paper
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions2016-05-04Paper
A hybrid exact method for a scheduling problem with a continuous resource and energy constraints2015-11-09Paper
Using column generation to compute lower bound sets for bi-objective combinatorial optimization problems2015-08-14Paper
Energetic reasoning for energy-constrained scheduling with a continuous resource2015-07-28Paper
Scheduling scientific experiments for comet exploration2015-04-29Paper
Fast minimum float computation in activity networks under interval uncertainty2014-08-18Paper
SAT and Hybrid Models of the Car Sequencing Problem2014-05-27Paper
Column Generation for Bi-Objective Vehicle Routing Problems with a Min-Max Objective2014-02-24Paper
Carpooling : the 2 Synchronization Points Shortest Paths Problem2014-02-24Paper
An exact method for the bi-objective one-machine problem with maximum lateness and unit family setup cost objectives2013-11-08Paper
Frequency assignment in a SDMA satellite communication system with beam decentring feature2013-11-07Paper
The resource-constrained modulo scheduling problem: an experimental study2013-06-28Paper
Constraint-propagation-based cutting planes: an application to the resource-constrained project scheduling problem2012-06-08Paper
Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling2012-05-13Paper
Optimization of occupancy rate in dial-a-ride problems via linear fractional column generation2011-03-25Paper
Event-based MILP models for resource-constrained project scheduling problems2010-10-15Paper
An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport2010-10-06Paper
Parallel machine scheduling with precedence constraints and setup times2010-09-07Paper
A memetic algorithm with a large neighborhood crossover operator for the generalized traveling salesman problem2010-06-11Paper
Vehicle routing problems with alternative paths: an application to on-demand transportation2010-01-15Paper
Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case2009-12-22Paper
The resource-constrained activity insertion problem with minimum and maximum time lags2009-12-02Paper
Articles ROADEF 20072009-11-12Paper
Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound2009-04-03Paper
The dynamic frequency assignment problem2009-01-08Paper
A branch and bound method for the job-shop problem with sequence-dependent setup times2008-09-03Paper
The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem2008-07-10Paper
Models and methods for frequency assignment with cumulative interference constraints2008-05-29Paper
https://portal.mardi4nfdi.de/entity/Q34264332007-03-09Paper
Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis2006-03-07Paper
Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems2005-12-27Paper
Maximization of solution flexibility for robust shop scheduling2005-04-21Paper
LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search2005-01-17Paper
Insertion techniques for static and dynamic resource-constrained project scheduling.2003-07-30Paper
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes2000-12-19Paper

Research outcomes over time