Integrated production scheduling and delivery routing: complexity results and column generation
From MaRDI portal
Publication:2835699
DOI10.1007/978-3-319-45587-7_38zbMATH Open1451.90056OpenAlexW2508199612MaRDI QIDQ2835699FDOQ2835699
Authors: Azeddine Cheref, Christian Artigues, J.-C. Billaut, Sandra Ulrich Ngueveu
Publication date: 30 November 2016
Published in: Lecture Notes in Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-45587-7_38
Recommendations
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan
- Integrated production, inventory and delivery problems: complexity and algorithms
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
- Integrated machine scheduling and vehicle routing with time windows
- Integrated Scheduling of Production and Distribution Operations
Cites Work
- Machine scheduling with job delivery coordination
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Scheduling with Fixed Delivery Dates
- Machine scheduling with transportation considerations
- Machine scheduling with deliveries to multiple customer locations
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- Production scheduling with supply and delivery considerations to minimize the makespan
- An exact algorithm for a vehicle routing problem with time windows and multiple use of vehicles
- A branch-and-cut-and-price algorithm for the cumulative capacitated vehicle routing problem
- Integrated production and distribution scheduling with lifespan constraints
- A zero-inventory production and distribution problem with a fixed customer sequence
- Logistics scheduling with batching and transportation
- Machine scheduling with pickup and delivery
Cited In (15)
- Robustness in nonsmooth nonconvex optimization problems
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs
- The production routing problem: a review of formulations and solution algorithms
- An improved memetic algorithm for integrated production scheduling and vehicle routing decisions
- Integrated production, inventory and delivery problems: complexity and algorithms
- A review on integrated scheduling and outbound vehicle routing problems
- A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows
- A comparison of column-generation approaches to the synchronized pickup and delivery problem
- Title not available (Why is that?)
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
- Title not available (Why is that?)
This page was built for publication: Integrated production scheduling and delivery routing: complexity results and column generation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2835699)