The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds
From MaRDI portal
Publication:6176180
DOI10.1007/s00291-022-00702-yzbMath1519.90068OpenAlexW4313800182WikidataQ123306733 ScholiaQ123306733MaRDI QIDQ6176180
Carolin Kellenbrink, Stefan Bugow
Publication date: 25 July 2023
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-022-00702-y
Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Time-dependent performance approximation of truck handling operations at an air cargo terminal
- Design of modern heuristics. Principles and application.
- Event-based MILP models for resource-constrained project scheduling problems
- Truck scheduling at zero-inventory cross docking terminals
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Truck scheduling in cross-docking terminals with fixed outbound departures
- A survey of scheduling with controllable processing times
- Integrated truck and workforce scheduling to accelerate the unloading of trucks
- Large-Scale, Less-than-Truckload Service Network Design
- Minimizing Total Tardiness on One Machine is NP-Hard
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Crossdocking—JIT scheduling with time windows
This page was built for publication: The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds