scientific article; zbMATH DE number 5845931
From MaRDI portal
Publication:3072899
DOI10.3785/J.ISSN.1008-973X.2009.01.005zbMATH Open1224.90087MaRDI QIDQ3072899FDOQ3072899
Authors: Ying Ying, Yongyi Shou, Min Li
Publication date: 5 February 2011
Title of this publication is not available (Why is that?)
Recommendations
- A hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A genetic algorithm for the resource constrained multi-project scheduling problem
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Genetic algorithm for the resource-constrained project scheduling problem
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Cited In (25)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem
- Comparative analysis of swarm intelligence and heuristic priority rules for solving multi-project scheduling problem
- A multi-colony ant algorithm for multi-objective resource-constrained project scheduling
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources
- Application of GA optimization for solving precedent relationship problem in project scheduling
- Title not available (Why is that?)
- The research on the multi-project human resource configuration based on the virus evolutionary genetic algorithm
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
- A hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems
- Resource allocation in multi-class dynamic PERT networks with finite capacity
- A teaching-learning-based optimization algorithm for multi-objective resource constrained project scheduling problem
- Resource allocation in dynamic PERT networks with finite capacity
- A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Research on the complicated time-constrained project scheduling in water conservancy
- A VNS-GA-based hybrid metaheuristics for resource constrained project scheduling problem
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3072899)