Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
From MaRDI portal
Publication:4230239
Recommendations
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
- Performance evaluation of scheduling policies for the DRCMPSP
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
- scientific article; zbMATH DE number 1728539
- MIP Formulations for Flowshop Scheduling with Limited Buffers
- A decomposition approach in a DSS for a resource constrained scheduling problem
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)
Cites work
Cited in
(6)- Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
- Impact of scheduling free goods on the throughput performance of a manufacturing operation
- Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
- TOC-based planning and scheduling model
This page was built for publication: Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4230239)