Scheduling using drum-buffer-rope in a remanufacturing environment
From MaRDI portal
Recommendations
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
- An evaluation of order release strategies in a remanufacturing environment
- Remanufacturing shop scheduling of parts under uncertain environment
- Product structure complexity and scheduling of operations in recoverable manufacturing
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
Cited in
(16)- Quantitative models for reverse logistics: A review
- An evaluation of order release strategies in a remanufacturing environment
- A label correcting algorithm for partial disassembly sequences in the production planning for end-of-life products
- Simple heuristics for push and pull remanufacturing policies
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
- Order review/release and lot splitting in drum-buffer-rope
- Economic ordering quantities for recoverable item inventory systems
- Flexible modelling of correlated operation times with application in product-reuse facilities
- Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes
- A generalized stochastic Petri-net model for performance analysis and allocation optimization of a particular repair system
- Remanufacturing shop scheduling of parts under uncertain environment
- Characteristics of the research on reverse logistics (1995–2005)
- Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
- End-of-life returns of long-lived products from end customer—insights from an ideally set up closed-loop supply chain
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
This page was built for publication: Scheduling using drum-buffer-rope in a remanufacturing environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4230125)