Order review/release and lot splitting in drum-buffer-rope
From MaRDI portal
Publication:4245233
DOI10.1080/002075497195731zbMATH Open0943.90543OpenAlexW2127579332MaRDI QIDQ4245233FDOQ4245233
Authors: G. R. Russell, Timothy D. Fry
Publication date: 13 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195731
Recommendations
- Order splitting in single sourcing with scheduled-release orders
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Order splitting in continuous review \((Q,r)\) inventory models
- Order review and release strategies ina job shop environment: A review and a classification
- Order batching in walk-and-pick order picking systems
- Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment
- Joint order batching and order picking in warehouse operations
- Releasing and Scheduling of Lots in a Wafer Fab
Cited In (6)
- Comparing kanban control with the theory of constraints using Markov chains
- Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
- A novel breakthrough system for mixed production goaling and control in semiconductor manufacturing
- Time bucket length and lot-splitting approach
- Concerning the theory of workload control
This page was built for publication: Order review/release and lot splitting in drum-buffer-rope
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245233)