Multimode resource-constrained project scheduling in flexible projects
From MaRDI portal
Publication:2301187
DOI10.1007/s10898-019-00832-8zbMath1442.90076OpenAlexW2978197491MaRDI QIDQ2301187
István Szalkai, Zsolt T. Kosztyán
Publication date: 28 February 2020
Published in: Journal of Global Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10898-019-00832-8
multimode resource-constrained project scheduling problemflexible project management approachesmatrix-based project planning
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- On the discrete time, cost and quality trade-off problem
- A characterization of heaps and its applications
- The discrete time-cost tradeoff problem revisited
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- Project management with time, cost, and quality considerations
- PSPLIB -- a project scheduling problem library
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- New computational results for the discrete time/cost trade-off problem with time-switch constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- A Faster Strongly Polynomial Minimum Cost Flow Algorithm
This page was built for publication: Multimode resource-constrained project scheduling in flexible projects