The use of cutsets in Monte Carlo analysis of stochastic networks
DOI10.1016/0378-4754(79)90007-7zbMath0416.90030MaRDI QIDQ754751
C. E. Sigal, J. J. Solberg, A. Alan B. Pritsker
Publication date: 1979
Published in: Mathematics and Computers in Simulation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0378-4754(79)90007-7
reliability; stochastic networks; Monte Carlo analysis; directed acyclic networks; equipment replacement analysis; maximal flow problems; network performance measures; Pert-type network planning; probabilistic arc durations; project planning; stochastic dynamic programming problems; uniformly directed cutsets
65C05: Monte Carlo methods
90B15: Stochastic network models in operations research
90B25: Reliability, availability, maintenance, inspection in operations research
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The use of cutsets in Monte Carlo analysis of stochastic networks
- The Stochastic Shortest Route Problem
- Distribution of the Time Through a Directed, Acyclic Network
- A Statistical Theory for PERT Critical Path Analysis
- Shortest Paths in Probabilistic Graphs
- Numerical Evaluation of Multiple Integrals
- Numerical Operators for Statistical PERT Critical Path Analysis
- Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
- More on Conditioned Sampling in the Simulation of Stochastic Networks