Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates
From MaRDI portal
Publication:697023
DOI10.1016/S1468-1218(01)00030-XzbMATH Open1006.90045MaRDI QIDQ697023FDOQ697023
Authors: M. C. Fu
Publication date: 12 September 2002
Published in: Nonlinear Analysis. Real World Applications (Search for Journal in Brave)
Recommendations
- Bicriteria scheduling on parallel machines: total tardiness and weighted flowtime in fuzzy environment
- One machine scheduling problem with fuzzy duedates
- Single Machine Scheduling to Minimize Total Late Work
- Solving Job-Shop Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- Title not available (Why is that?)
- Fuzzy sets and systems. Theory and applications
- Title not available (Why is that?)
- Title not available (Why is that?)
- The mean value of a fuzzy number
- The expected value of a fuzzy number
- Single value simulation of fuzzy variable
- Title not available (Why is that?)
- Two scheduling problems with fuzzy due-dates
- Scheduling arrivals to a production system in a fuzzy environment
- One machine scheduling problem with fuzzy duedates
Cited In (2)
This page was built for publication: Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q697023)