USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
DOI10.1142/S0218488508005340zbMATH Open1142.90520MaRDI QIDQ3524397FDOQ3524397
Authors: Peng-Jen Lai, Hsien-Chung Wu
Publication date: 9 September 2008
Published in: International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems (Search for Journal in Brave)
Recommendations
- scientific article; zbMATH DE number 1539052
- AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Solution of a fuzzy flowshop scheduling problem using a necessity measure
- scientific article; zbMATH DE number 1539054
Dynamic programming (90C39) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70) Stochastic scheduling theory in operations research (90B36)
Cites Work
- Matlab
- Ranking fuzzy numbers in the setting of possibility theory
- Fuzzy sets
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- Title not available (Why is that?)
- Title not available (Why is that?)
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS
- One machine scheduling problem with fuzzy random due-dates
- Two scheduling problems with fuzzy due-dates
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
Cited In (13)
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
- Title not available (Why is that?)
- Title not available (Why is that?)
- USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS
- Genetic algorithm based on similarity of intuitionistic fuzzy sets for many-objective flow shop scheduling problems
- Title not available (Why is that?)
- AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
- Multi-objective flow shop scheduling problem with stochastic parameters: fuzzy goal programming approach
- Solution of a fuzzy flowshop scheduling problem using a necessity measure
- Two-level GA-based method of fuzzy planning and scheduling
- A genetic algorithm for flexible job shop scheduling with fuzzy processing time
Uses Software
This page was built for publication: USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3524397)