Scheduling preemptive open shops to minimize total tardiness
From MaRDI portal
Publication:707141
DOI10.1016/J.EJOR.2003.10.010zbMATH Open1132.90330OpenAlexW2010505063MaRDI QIDQ707141FDOQ707141
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.10.010
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Minimizing Total Tardiness on One Machine is NP-Hard
- Open Shop Scheduling to Minimize Finish Time
- Scheduling ordered open shops
- A dual algorithm for the one-machine scheduling problem
- Dynamic Programming Solution of Sequencing Problems with Precedence Constraints
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- On the complexity of preemptive open-shop scheduling problems
- A Note on Open Shop Preemptive Schedules
- Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops
- Minimizing Maximum Lateness in a Two-Machine Open Shop
Cited In (3)
This page was built for publication: Scheduling preemptive open shops to minimize total tardiness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q707141)