Scheduling under machine breakdown in a continuous process industry
From MaRDI portal
Recommendations
- Assessing the effects of machine breakdowns in stochastic scheduling
- scientific article; zbMATH DE number 4043597
- Uncertain flexible flow shop scheduling problem subject to breakdowns
- An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
- scientific article; zbMATH DE number 777705
Cites work
- scientific article; zbMATH DE number 4074791 (Why is no real title available?)
- scientific article; zbMATH DE number 3527787 (Why is no real title available?)
- A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
- Match-up scheduling under a machine breakdown
- Minimum Change-Over Scheduling of Several Products on One Machine
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
Cited in
(3)
This page was built for publication: Scheduling under machine breakdown in a continuous process industry
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1765549)