scientific article; zbMATH DE number 777705
From MaRDI portal
Publication:4840280
zbMATH Open0828.90065MaRDI QIDQ4840280FDOQ4840280
Authors: Parkash Lal Maggu, L. C. Mehta
Publication date: 27 August 1995
Title of this publication is not available (Why is that?)
Recommendations
- scientific article; zbMATH DE number 777704
- scientific article; zbMATH DE number 4068595
- Heuristics for two-machine flowshop scheduling with setup times and an availability constraint
- Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- A New Heuristic for a Single Machine Scheduling Problem with Set-up Times
- Batch scheduling on a two-machine jobshop with machine-dependent setup times
- Heuristics for the two-machine scheduling problem with a single server
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Publication:4944735
Cited In (4)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4840280)