Two-machine flowshop group scheduling problem
From MaRDI portal
Publication:1577379
DOI10.1016/S0305-0548(99)00070-2zbMath0970.90037WikidataQ127797849 ScholiaQ127797849MaRDI QIDQ1577379
Publication date: 4 September 2000
Published in: Computers \& Operations Research (Search for Journal in Brave)
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Related Items
A comprehensive review of flowshop group scheduling literature, Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times., A survey of scheduling problems with setup times or costs, Multi-family scheduling in a two-machine reentrant flow shop with setups, Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times, Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines, A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem, Single-machine group scheduling with a time-dependent learning effect, A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups, Optimization of processing and delivery decisions involving third-party machines, Généralisation Max-Plus des bornes de Lageweg, Lenstra et Rinnooy Kan
Cites Work
- Unnamed Item
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Optimal two- and three-stage production schedules with setup times included
- OPTIMAL SCHEDULE IN A GT-TYPE FLOW-SHOP UNDER SERIES-PARALLEL PRECEDENCE CONSTRAINTS
- Sequency on two and three machines with setup, processing and removal times separated
- TWO-AND THREE-MACHINE FLOW-SHOP MAKESPAN SCHEDULING PROBLEMS WITH ADDITIONAL TIMES SEPARATED FROM PROCESSING TIMES
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns