Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
From MaRDI portal
Publication:1420383
DOI10.1016/S0377-2217(03)00264-9zbMath1099.90544OpenAlexW2014311301MaRDI QIDQ1420383
Publication date: 2 February 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(03)00264-9
Related Items
Scheduling semiconductor in-line steppers in new product/process introduction scenarios, A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups, A comprehensive review of flowshop group scheduling literature, A survey of scheduling problems with setup times or costs, An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers, An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers, Differential evolution metaheuristics for distributed limited-buffer flowshop scheduling with makespan criterion, An effective hybrid genetic algorithm for flow shop scheduling with limited buffers, An approach for integrated scheduling and lot-sizing, A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE, A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times, Steelmaking-continuous casting scheduling problem with multi-position refining furnaces under time-of-use tariffs
Cites Work
- Unnamed Item
- Batch scheduling in a two-machine flow shop with limited buffer
- Two-machine group scheduling problem with blocking and anticipatory setups
- Two-machine flowshop group scheduling problem
- Scheduling with batching: A review
- A mathematical programming model for scheduling steelmaking-continuous casting production
- Optimal two- and three-stage production schedules with setup times included
- Flowshop scheduling with limited temporary storage
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- The Complexity of Flowshop and Jobshop Scheduling
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
- Sequencing n jobs on two machines with setup, processing and removal times separated
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Solution of the Flowshop-Scheduling Problem with No Intermediate Queues
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process