Solution of the Flowshop-Scheduling Problem with No Intermediate Queues
From MaRDI portal
Publication:5652441
DOI10.1287/OPRE.20.3.689zbMATH Open0241.90031OpenAlexW1996800651MaRDI QIDQ5652441FDOQ5652441
Publication date: 1972
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.20.3.689
Cited In (39)
- A survey of optimal control of distributed-parameter systems
- Some local search algorithms for no-wait flow-shop problem with makespan criterion
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- Scheduling in supply chain environment
- Two machine flow shop scheduling problem with no wait in process: Controllable machine speeds
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search
- Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion
- A review of TSP based approaches for flowshop scheduling
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
- New heuristics for no-wait flowshops to minimize makespan.
- Flowshop-scheduling problems with makespan criterion: a review
- Scheduling two-machine no-wait open shops to minimize makespan
- The Directed Minimum Latency Problem
- No-wait flowshops with bicriteria of makespan and maximum lateness.
- Lot sizing in a no-wait flow shop
- On the exact solution of the no-wait flow shop problem with due date constraints
- Complete local search with limited memory algorithm for no-wait job shops to minimize makespan
- Minimizing makespan for a no-wait flowshop using genetic algorithm
- No-wait job shop scheduling: tabu search and complexity of subproblems
- No-wait flowshop scheduling Is as hard as asymmetric traveling salesman problem
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling
- Scatter search with path relinking for the job shop with time lags and setup times
- Applications of max-plus algebra to flow shop scheduling problems
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- Flow-Shop Sequencing with no Intratnachine Waiting: Minimization of Total Waiting Cost
- An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach
- COMPARISON OF SCHEDULING EFFICIENCY IN TWO/THREE-MACHINE NO-WAIT FLOW SHOP PROBLEM USING SIMULATED ANNEALING AND GENETIC ALGORITHM
- Some no-wait shops scheduling problems: Complexity aspect
- On no-wait and no-idle flow shops with makespan criterion
- Two models for a family of flowshop sequencing problems
- Solving the continuous flow-shop scheduling problem by metaheuristics.
- Approximative procedures for no-wait job shop scheduling.
- Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
- Batch scheduling in a two-machine flow shop with limited buffer
- An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops
- The optimization of dynamical systems
- New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
- The no-wait flow-shop paradox
This page was built for publication: Solution of the Flowshop-Scheduling Problem with No Intermediate Queues
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5652441)