Scheduling semiconductor in-line steppers in new product/process introduction scenarios
From MaRDI portal
Publication:3163705
DOI10.1080/00207540802577920zbMath1197.90237OpenAlexW2025087495MaRDI QIDQ3163705
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802577920
design of experimentscomputer visionroboticsavailabilitycontrol chartsdesign for manufacturecapability indicesactivity based costing
Related Items (2)
The throughput rate of serial production lines with deterministic process times and random setups: Markovian models and applications to semiconductor manufacturing ⋮ Scheduling of multiple in-line steppers for semiconductor wafer fabs
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A taxonomy of flexible flow line scheduling procedures
- New evolutionary genetic algorithms for NP-complete combinatorial optimization problems
- Performance of scheduling algorithms for no-wait flowshops with parallel machines
- A genetic algorithm for flowshop sequencing
- A genetic algorithm for the job shop problem
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- A review of TSP based approaches for flowshop scheduling
- Performance evaluation of photolithography cluster tools
- A Survey of Scheduling Rules
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Survey of scheduling research involving setup times
- Make-to-order scheduling in foundry semiconductor fabrication
- Flowshop-scheduling problems with makespan criterion: a review
This page was built for publication: Scheduling semiconductor in-line steppers in new product/process introduction scenarios