Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup
From MaRDI portal
Publication:3621499
Recommendations
- scientific article; zbMATH DE number 3852771
- Total flowtime in no-wait flowshops with separated setup times.
- Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
- scientific article; zbMATH DE number 5247431
- Job lateness in flowshops with setup and removal times separated
Cites work
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- A new heuristic method for the flow shop sequencing problem
- A New Heuristic Method for the Permutation Flow Shop Scheduling Problem
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- A review of TSP based approaches for flowshop scheduling
- A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times
- An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times
- Flowshop scheduling research after five decades
- Flowshop-scheduling problems with makespan criterion: a review
- Heuristics for the flow line problem with setup costs
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- scientific article; zbMATH DE number 3754389 (Why is no real title available?)
- scientific article; zbMATH DE number 3436435 (Why is no real title available?)
- Job lateness in flowshops with setup and removal times separated
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times
- The Complexity of Flowshop and Jobshop Scheduling
- The two-machine sequence dependent flowshop scheduling problem
- Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach
- Two-stage no-wait scheduling models with setup and removal times separated
Cited in
(6)- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- Job lateness in flowshops with setup and removal times separated
- The flow shop problem with time lags and separated setup times
- scientific article; zbMATH DE number 5247431 (Why is no real title available?)
- Facility layout based on sequence analysis: design of flowshops
- The Browne-Yechiali single-machine sequence is optimal for flow-shops
This page was built for publication: Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3621499)