Scheduling multi-stage parallel-processor services to minimize average response time
From MaRDI portal
Publication:3369255
Recommendations
Cited in
(5)- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop
- Metaheuristic algorithms for the hybrid flowshop scheduling problem
- The hybrid flow shop scheduling problem
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
This page was built for publication: Scheduling multi-stage parallel-processor services to minimize average response time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3369255)