Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (Q706971): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Minimizing production flow time in a process and assembly job shop / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3938812 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4198056 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A branch and bound algorithm for the two-stage assembly scheduling problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: The Two-Stage Assembly Scheduling Problem: Complexity and Approximation / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: On general routing problems / rank | |||
Normal rank |
Latest revision as of 16:58, 7 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times |
scientific article |
Statements
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (English)
0 references
9 February 2005
0 references
Scheduling
0 references
Branch and bound
0 references
Flow-shop
0 references
Machining operation
0 references
Assembly operation
0 references