Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
From MaRDI portal
(Redirected from Publication:706971)
Recommendations
- The three-stage assembly flowshop scheduling problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
- Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
- The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
- scientific article; zbMATH DE number 4079154
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
Cites work
- scientific article; zbMATH DE number 3754389 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Minimizing production flow time in a process and assembly job shop
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- On general routing problems
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
Cited in
(7)- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
- Flow-shop scheduling with setup and assembly operations
- The production scheduling problem in a multi-page invoice printing system
- Optimal scheduling of the 3-machine assembly-type flow shop
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
- Optimization study of three-stage assembly flowshop problem in pharmacy automation dispensing systems
This page was built for publication: Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q706971)