Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system

From MaRDI portal
Publication:2286964

DOI10.1016/j.ejor.2019.11.016zbMath1431.90073OpenAlexW2989902167WikidataQ126651728 ScholiaQ126651728MaRDI QIDQ2286964

Sicheng Zhang, Xiang Li, Bowen Zhang, Shou-Yang Wang

Publication date: 23 January 2020

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2019.11.016




Related Items (5)



Cites Work


This page was built for publication: Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system