A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
From MaRDI portal
Publication:2256205
Recommendations
Cites work
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- scientific article; zbMATH DE number 44978 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 5039510 (Why is no real title available?)
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A competitive scheduling problem and its relevance to UMTS channel assignment
- A multiple-criterion model for machine scheduling
- A new dynamic programming formulation for scheduling independent tasks with common due date on parallel machines
- A note on the complexity of the problem of two-agent scheduling on a single machine
- A note on the scheduling with two families of jobs
- A review and evaluation of multiobjective algorithms for the flowshop scheduling problem
- A two-machine flowshop problem with two agents
- An investigation on a two-agent single-machine scheduling problem with unequal release dates
- Analyzing scheduling with transient failures
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- Approximation of Pareto Optima in Multiple-Objective, Shortest-Path Problems
- Approximation schemes for two-machine flow shop scheduling with two agents
- Competitive two-agent scheduling and its applications
- Computing the Nash solution for scheduling bargaining problems
- Considering scheduling and preventive maintenance in the flowshop sequencing problem
- Due dates assignment and JIT scheduling with equal-size jobs
- Fully polynomial approximation schemes for a symmetric quadratic knapsack problem and its scheduling applications
- Heterogeneous-criteria scheduling: Minimizing weighted number of tardy jobs and weighted completion time
- Innovations in multi-agent systems and application -- 1.
- Mixed Criteria Packet Scheduling
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multicriteria Optimization
- Multicriteria scheduling
- Multicriteria scheduling problems: a survey
- Multicriteria scheduling. Theory, models and algorithms. Translated from the French by Henry Scott.
- Optimal methods for batch processing problem with makespan and maximum lateness objectives
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
- RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN
- Rescheduling for New Orders
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Rescheduling problems with deteriorating jobs under disruptions
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- Scheduling Problems with Two Competing Agents
- Scheduling interfering job sets on parallel machines
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
- Scheduling two agents on uniform parallel machines with~makespan and cost functions
- Scheduling two agents with controllable processing times
- Setting a common due date in a constrained flowshop: a variable neighbourhood search approach
- Single machine batch scheduling with two competing agents to minimize total flowtime
- Single machine family scheduling with two competing agents to minimize makespan
- Single-machine multi-agent scheduling problems with a global objective function
- Solving a two-agent single-machine scheduling problem considering learning effect
- Solving multi-agent scheduling problems on parallel machines with a global objective function
- Time-dependent scheduling
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Two-agent scheduling to minimize the total cost
- Two-agent scheduling with position-based deteriorating jobs and learning effects
- Two-agent single-machine scheduling problems under increasing linear deterioration
- Unbounded parallel-batching scheduling with two competitive agents
Cited in
(60)- Two-agent integrated scheduling of production and distribution operations with fixed departure times
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Single machine scheduling with two competing agents, arbitrary release dates and unit processing times
- Pareto-scheduling of two competing agents with their own equal processing times
- Two-agent single-machine scheduling with release dates to minimize the makespan
- Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
- Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs
- Proportionate flow shop scheduling with two competing agents to minimize weighted late work and weighted number of late jobs
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems
- Two-machine and two-agent flow shop with special processing times structures
- Due date assignment and two-agent scheduling under multitasking environment
- Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives
- A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan
- Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem
- Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants
- Two competitive agents to minimize the weighted total late work and the total completion time
- Complexities of four problems on two-agent scheduling
- Competitive project scheduling on two unbounded parallel batch machines
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work
- Two-agent scheduling problems with the general position-dependent processing time
- Single-machine scheduling of multiple projects with controllable processing times
- Single machine scheduling with two competing agents and equal job processing times
- Scheduling to minimize the maximum total completion time per machine
- Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
- Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs
- Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine
- The service-oriented multiagent approach to high-performance scientific computing
- Two-agent scheduling on a single machine with release dates
- Decentralized task coordination
- Multitasking scheduling problems with two competitive agents
- Two-agent supply chain scheduling problem to minimize the sum of the total weighted completion time and batch cost
- Two-agent parallel-machine scheduling with rejection
- Competitive multi-agent scheduling with an iterative selection rule
- Two‐agent scheduling with linear resource‐dependent processing times
- Competitive two-agent scheduling problems to minimize the weighted combination of makespans in a two-machine open shop
- Two-agent scheduling in a flowshop
- Optimally rescheduling jobs with a last-in-first-out buffer
- Two-agent single-machine scheduling with cumulative deterioration
- Scheduling two job families on a single machine with two competitive agents
- Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints
- Single-machine scheduling with multi-agents to minimize total weighted late work
- Single machine scheduling with interfering job sets
- Scheduling with competing agents, total late work and job rejection
- Scheduling two projects with controllable processing times in a single-machine environment
- Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs
- Two-agent parallel machine scheduling with a restricted number of overlapped reserved tasks
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
- Algorithms for two-agent unbounded serial-batch scheduling with makespan and maximum lateness objectives
- A review and classification on distributed permutation flowshop scheduling problems
- Single-machine preemptive scheduling with release dates involving the total weighted late work criterion
- Competitive two-agent scheduling with release dates and preemption on a single machine
- Two-agent single-machine scheduling with a rate-modifying activity
- An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain
- Nesting and scheduling optimization of additive manufacturing systems: mapping the territory
- Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria
This page was built for publication: A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2256205)