Two-agent single-machine scheduling with cumulative deterioration
From MaRDI portal
Publication:2001202
Recommendations
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Two-agent single-machine scheduling problems under increasing linear deterioration
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- A two-agent scheduling problem with deterioration
- Single machine two-agent scheduling with deteriorating jobs
Cites work
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- A competitive scheduling problem and its relevance to UMTS channel assignment
- A concise survey of scheduling with time-dependent processing times
- A multiple-criterion model for machine scheduling
- A note on the complexity of the problem of two-agent scheduling on a single machine
- Competitive two-agent scheduling and its applications
- Complexities of some problems on multi-agent scheduling on a single machine
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Multi-agent scheduling on a single machine with a fixed number of competing agents to minimize the weighted sum of number of tardy jobs and makespans
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multiagent scheduling. Models and algorithms
- Scheduling algorithms
- Scheduling Problems with Two Competing Agents
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- Single-machine scheduling problems with past-sequence-dependent setup times
- The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect
- Time-dependent scheduling
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Two-agent single-machine scheduling problems under increasing linear deterioration
Cited in
(8)- Two-agent scheduling with rejection on a single machine
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- A two-agent scheduling problem with deterioration
- Two-agent single-machine scheduling problems under increasing linear deterioration
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
- A two-agent resource allocation scheduling problem with slack due-date assignment and general deterioration function
- Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria
- No-idle flow shop scheduling with deteriorating jobs and common due date under dominating machines
This page was built for publication: Two-agent single-machine scheduling with cumulative deterioration
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2001202)