Considering scheduling and preventive maintenance in the flowshop sequencing problem
DOI10.1016/J.COR.2005.12.007zbMATH Open1128.90031OpenAlexW2033437970MaRDI QIDQ883296FDOQ883296
J. Carlos García-Díaz, Rubén Ruiz, Concepción Maroto
Publication date: 4 June 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.12.007
Recommendations
- Two-machine flow shop scheduling integrated with preventive maintenance planning
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Optimal two- and three-stage production schedules with set-up time included
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- Title not available (Why is that?)
- A fast tabu search algorithm for the permutation flow-shop problem
- Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs.
- A comprehensive review and evaluation of permutation flowshop heuristics
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
- On general routing problems
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A contribution to the stochastic flow shop scheduling problem.
- Optimum Preventive Maintenance Policies
- Title not available (Why is that?)
- An Evaluation of Flow Shop Sequencing Heuristics
- Title not available (Why is that?)
- Maintenance Policies for Stochastically Failing Equipment: A Survey
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- A survey of maintenance models: The control and surveillance of deteriorating systems
- Single-machine scheduling with maintenance and repair rate-modifying activities
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimal strategies for some repair replacement models
- A new heuristic method for the flow shop sequencing problem
- A repair replacement model
- Production and maintenance integrated planning
Cited In (19)
- Production, maintenance and resource scheduling: a review
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
- Single-machine multiple-recipe predictive maintenance
- Data-driven predictive maintenance policy based on multi-objective optimization approaches for the component repairing problem
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach
- Digital twin-enabled dynamic scheduling with preventive maintenance using a double-layer Q-learning algorithm
- A review and classification on distributed permutation flowshop scheduling problems
- Flow shops with machine maintenance: ordered and proportionate cases
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate
- Two-machine flow shop scheduling integrated with preventive maintenance planning
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
- Recursive operation time maximization model for the maintenance of power generation equipment
- Minimizing total completion time on a single machine with a flexible maintenance activity
- Multi-machine preventive maintenance scheduling with imperfect interventions: a restless bandit approach
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
Uses Software
This page was built for publication: Considering scheduling and preventive maintenance in the flowshop sequencing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q883296)