Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach
DOI10.1007/s43069-021-00098-5zbMath1476.90102OpenAlexW3206091653MaRDI QIDQ2241323
Seyed Habib A. Rahmati, Behrooz Shahbazi
Publication date: 8 November 2021
Published in: SN Operations Research Forum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s43069-021-00098-5
uncertaintysimulation-based optimizationmeta-heuristic algorithmsflexible manufacturing modelpredictive maintenance system
Programming involving graphs or networks (90C35) Approximation methods and heuristics in mathematical programming (90C59) Reliability, availability, maintenance, inspection in operations research (90B25) Mathematical modeling or simulation for problems pertaining to operations research and mathematical programming (90-10)
Cites Work
- Unnamed Item
- Unnamed Item
- Genetic tabu search for the fuzzy flexible job shop problem
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate
- A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms
- Evaluation of mathematical models for flexible job-shop scheduling problems
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- Shock and damage models in reliability theory
- New single machine and job-shop scheduling problems with availability constraints
- Considering scheduling and preventive maintenance in the flowshop sequencing problem
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
- Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
- Two-machine flowshop scheduling with availability constraints
- Approximability of two-machine no-wait flowshop scheduling with availability constraints.
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates
- A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
- Scheduling jobs and maintenance activities on parallel machines
- Parallel machine scheduling with machine availability and eligibility constraints
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Fuzzy statistics: hypothesis testing
- Complexity results and approximation algorithms for the two machine no-wait flow-shop with limited machine availability
- Scheduling jobs and maintenance activities on parallel machines
This page was built for publication: Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach