Minimizing the makespan for the flow shop scheduling problem with availability constraints.

From MaRDI portal
Publication:1420378

DOI10.1016/S0377-2217(03)00261-3zbMath1099.90536MaRDI QIDQ1420378

Riad Aggoune

Publication date: 2 February 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (18)

Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational studyHeuristics for two-machine flowshop scheduling with setup times and an availability constraintScheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rateBi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problemConsidering scheduling and preventive maintenance in the flowshop sequencing problemA two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machinesThe parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approachA novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approachSingle-machine scheduling with an availability constraint to minimize the weighted sum of the completion timesMultiobjective optimization for complex flexible job-shop scheduling problemsDeveloping a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approachAn approach for integrated scheduling and lot-sizingComputing lower and upper bounds for a large-scale industrial job shop scheduling problemSolving an integrated job-shop problem with human resource constraintsMixed integer linear programming models for flow shop scheduling with a demand plan of job typesScheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristicsScheduling Resources for Throughput MaximizationProduction, maintenance and resource scheduling: a review


Uses Software


Cites Work




This page was built for publication: Minimizing the makespan for the flow shop scheduling problem with availability constraints.