Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
From MaRDI portal
Publication:5059220
DOI10.1080/0305215X.2018.1540696OpenAlexW2901109730WikidataQ128878560 ScholiaQ128878560MaRDI QIDQ5059220
Ershun Pan, Changbai Tan, Tangbin Xia, Hanxin Feng, Li-Feng Xi
Publication date: 23 December 2022
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2018.1540696
Related Items
Proportionate flowshop scheduling with position-dependent weights, Due-window assignment scheduling problems with position-dependent weights on a single machine, Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems, Evolutionary job scheduling with optimized population by deep reinforcement learning, Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times, An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem, Predictive Maintenance and Upgrade Scheduling for Production Line under Multi-period Product-service Paradigm, Production, maintenance and resource scheduling: a review
Cites Work
- A discrete inter-species cuckoo search for flowshop scheduling problems
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
- Group technology in a hybrid flowshop environment: a case study
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint